Land survey calculation pdf

Make calculations, field notes and survey drawings for the layout and control of the work as are necessary to construct the project as specified. Ensv2se h1 surveying engineering 201 chapter 12 construction surveying this consists of all forms of setting out as well as the survey of existing buildings, and encompasses a number of the other facets of survey i. Land surveying is basically an art and science of mapping and measuring land. Land surveyors measure horizontal positions in geographic or plane coordinate. The statistic that should be used in calculating the range of acceptable values for a given. In plane surveying, the earth is assumed to be a flat horizontal surface a plane. Construction surveying manual for contractors odot page 2 of 31 engineering automation january 15, 2021 control network an array of control stations either established by the contractor or provided by the agency. Surveying traverse almost all surveying requires some calculations to reduce measurements into a more useful form for determining distance, earthwork volumes, land areas, etc. Because only a surveyor who has full understanding of surveying techniques will be able to determine the most efficient methods required to obtain optimal results over a wide variety of surveying problems. Surveying measurements measuring distances and angles from a known reference are fundamental surveying operations.

This process can be repeated from station to station to calculate the coordinates of each station in turn. Basic surveying student workbook page 7 of 52 3152007 centerline staking the maximum staking interval for the project centerline shall be 100 ft on tangents and 50 ft on curves or as specified on the survey tabulation sheet. Distances and directions determine the horizontal positions of these points. The primary unit of angular measurement in the metric system is the radian. In addition, a new section has been added on public land survey. It is the art of measuring horizontal and vertical distances between objects, of measuring angles between lines, of determining the direction of lines, and of establishing points by predetermined angular and linear measurements.

In this video i have explained how to find out a coordinate of a point where we know the length and bearing of that point from a known coordinate point. Calculate the average number of paces for each distance. Each calculator is programmed, updated, and verified so you can begin using it from day one. Check everything that is staked and always have another member of the crew double check any calculations that someone has made. Chapter 3 surveying equipment, measurements and errors wsdot. Traverse pc focuses on what land surveyors and geospatial professionals do every day and meets those needs better than anyone else. Strength of figures the strength of figure is a factor to be considered in establishing a triangulation system to maintain the computations within a desired degree of precision. Surveying and mapping manual minnesota department of.

Basics of least squares adjustment computation in surveying. Surveying is the process of determining relative positions of different objects on the surface of the earth b y measuring horizontal distances between t hem and preparing a map to any sui table scale. Calculating horizontal distances, vertical heights and reduced levels. To begin the grid, the surveyor establishes an initial point from which to begin surveying. It is a continuation of the first course held in the same. This manual is produced to assist the surveyor trainees understand the basics of surveying using a level instrument particularly the dumpy level. It is a basic course for all universities for civil engineers. Always visually check field staking making sure it looks correct. Survey field procedures manual prepared by the division of. It also maintains records of survey data, provides land surveying and. The surveyors should have sound knowledge on how the scale factor utilized with field observations and office calculations is vital while handling grid coordinates i. Field book example please remember that you can use additional pages to clearly show all necessary information trial 20m 40m 60m 1 30 58 90 2 30 57 89 3 31 57 90.

Here in we have gathered some pdf lectures on surveying. Spmotnulmt of land rtcords and r land records i 9 i 2 etric system and corrected up to 29772,d. In this exercise you will carry out the geometric calculations that would enable you to determine the precise coordinates of the control survey points. Surveying manual surveying is the science of determining the relative positions of objects or points on the earths surface. Deaf and hearing impaired people call 18008336388 tty relay service. The use of levels and total stations is illustrated by a series of practical examples. When putting in a new road or logging 40 acres, for example, it generally doesnt matter if you are off by a fraction of a. Measuring over rough ground or areas of brush requires the tape to be held. Surveying is the art of making suitable measurements in horizontal or vertical planes. Representing the land surveyors association of washington. Calculate the quality of cement concrete and the material required. Draft survey calculations xls draft survey equipment.

Surveying formulas 177 units of measurement 177 theory of errors 178 measurement of distance with tapes 179 vertical control 182 stadia surveying 183 photogrammetry 184 chapter 8. This article discusses various methods for calculating or measuring the area of the land like simple geometrical method, planimeter on the map, using measuring wheel, using the graph paper, using gps instrument, using aerial photographs, satellite imaging etc. A furlong, used in horse racing, is 10 chains, or 660 feet. For most purposes, plane surveys level of accuracy is sufficient.

Preserve survey monuments and control stations according to chapter 6. Tacheometric surveying solved problems surveying youtube. Survey data is portrayed graphically by the construction of maps, profiles, cross sections, and diagrams. Basic surveying mathematics that applies to land surveying profession. Coordinate system in surveyingconcepttheory calculation. But for determining the areas of irregular polygons, different methods are used. Nlcs fully preprogrammed hp35s has all the land surveying applications you need for school, standardized tests, or the field. Ls is the conventional technique for adjusting surveying measurements. Advanced surveying mathematics that applies to land surveying profession. Introduction to quantity surveying and its importance. Changing face it is the operation of bringing the vertical circle to the right of the observer,if originally it is to the left, and vice versa. Control station any item identified in the project records as having a position and elevation on the project datum and intended to be used to control the many phases of the. In the first half of the 19th century the least squares ls 2 adjustment technique was developed.

Many survey tasks the calculation of areas or volumes, the collection, checking, and staking of points or the transfer of heights can be performed automatically using builtin application programs. Follow techniques that will help detect and eliminatealltheblunders. Eliminate or correct all systematic errors by frequent calibration and adjustment of the instruments minimize the random errors by using good instrumentsandfieldprocedures. Firstly revolve the telescope through 1800 in a vertical plane and. Persons with disabilities may request this information be prepared in alternate forms by calling collect 360 6649009. Surveying measurements are usually compromised by errors in field observations and therefore require mathematical adjustment 1. Basic surveying manual michigan technological university. The calculations involved in plane surveying are relatively simple. Generally, the lands will be of irregular shaped polygons. In order to calculate the heights of points a datum is required, i.

We hope students all over the world will find it helpful. There are formulae readily available for regular polygons like, triangle, rectangle, square and other polygons. A radian is defined as the angle between radius lines from either end of an arc of radius length. Differential leveling computation of elevations group problem 1 prepare a set of level notes for the survey illustrated below. Hp35s loaded with land surveying programs nlc land surveyor. Please explain the role of longitudinal center of floatation lcf, tonne per centimeter tpc and moment to change trim mtc in the calculation of draft survey of bulk cargo vessels. Introduction to engineering surveying ce 5 levellingtheory. Surveyors take care of small but vital modifications to their field surveys constantly. All the calculations were found using equations which were found from mr. Covers calculations for horizontal curves, vertical curves, spiral curves, lattitudes and departures, azimuths, northings and eastings, area measurement, topo leveling, earthwork volume and.

The main objective of the surveying is to compute the areas and volumes. Definition of scale factor how to calculate scale factor in. In addition to total station and level measurement, surveying with gnss satellite systems will be briefly discussed. When surveyors measure angles, the resultant calculations are typically. Civl 1101 surveying introduction to differential leveling 57. You can make the calculations more easily if you record the field measurements in a table, as shown in the example. When surveyors measure angles, the resultant calculations are typically reported as either azimuths or bearings, as seen in figure 5. Land surveying calculation software free download land. Three decades and twenty plus versions later, were still producing great software, with great support, at a great price. Through the use of trigonometric calculations, the distance and angle measurements are used to establish three dimensional 3d coordinates for each surveyed point. Hp35s loaded with land surveying programs nlc land. This is one of the important subjects of civil engineering. Bench mark bm a permanent object that has a known height above mean sea level or other reference datum that are provided by the. The public land survey system study guide 4 of 34 the rectangular survey system is basically a grid of lines based upon a true meridian and is originated from an initial point.

To calculate the areas and volumes,involved in the various engineering projects. Many errors can be caught beforehand or eliminated if the survey crew stays aware and. For this purpose, the use of bench marks is necessary and these are classified as follow. April 2004 figure 1 the three main types of levels. However care needs to be taken to ensure that the bearing is being used correctly in the calculation. Department surveying when the bid schedule does not contain pay item 625, construction surveying, the engineer will furnish one set of construction stakes and marks establishing lines and grades as described below for. Surveying is a very important part of civil engineering. Distances, angles, directions, locations, elevations, areas, and volumes are thus determined from the data of the survey. Rods are commonly used in early highway rightof way descriptions. Land needs to be measured for various reasons like prior to purchase, when doing stock taking, building a boundary wall, dispute with a. Provide original or copies of notes, calculations and drawings as requested. Surveyors chain other multiples of the chain are still in use today. This is very important as without this service, there would not have been railroads.

Write up the lab in your field book, refer to the following example. One of your first tasks is to work with a senior engineering surveyor to. Some closure, radiations, joins, offsets have a heritage extending back to hp desktopcomputer programs from the 1970s written by bodo taube of francis ohalloran, surveyors. Only one distance ap, bp or cp and their corresponding bearings are needed to calculate the coordinates of p but if one is used then the others can then be used as a check on the accuracy of the computation. This is the 2nd course held at agrosphere project base jamama and is expected to take a duration of two months from mid march to mid my 2004. Types of surveying on the basis of whether the curvature of the earth is taken into account or not,surveying can be divided into two main categories. An average elevation was also selected and used to calculate the basic.

Rise and fall method, rise and fall method of surveying, surveying, levelling survey, surveying leveling calculations, how to calculate rl in the surveywatch. For example, in figure 7b station b lies to the east and south of a so the difference easting and the difference. For a given change in the angles, the sine of small. Nice elaboration of methods of measurement of areas on drawings of area surveyed. Survey records and computations such as field notes, level books, field books. But it still requires to give reference of any authority or national or international standard which shows that area under river or water body enclosed by land surveyed is not to be deducted form the total area surveyed for the purpose of payment of the total area surveyed. This manual provides basic concepts about surveying and is intended for use in the. Without taking a survey of the plot where the construction is to be carried out, the work cannot begin 2. Figure 1 calculating horizontal latitude and longitude coordinates 125. A traverse is developed by measuring the distance and angles between points that found the boundary of a site we will learn several different techniques to compute the. Robillard 11 introduction 1 12 oveiview 1 the future 1 14 background of surveying and mapping 1 15 the suiveying profession 2 16 suiveying literature 2 17 suiveying education 2 2 surveying field notes, data collectors 3 russell c. Soil and earthwork formulas 185 physical properties of soils 185 index parameters for soils 186 relationship of weights and volumes in.

510 55 1146 742 255 376 1484 719 917 1600 1146 1130 692 958 877 182 575 497 689 445 1523 1157 1165 1334 631 1327 1333 1122 281 1102 1015 1538 1310 259 1204 1159 1060